What Opens at Wedge Preserve Park on December 5

November 19, 2026
Do you want content like this delivered to your inbox?
A sunny green South Florida park lawn beside a shaded picnic pavilion, with live oaks and palms in the background.

Where in Parkland can you reserve a pickleball court today? In the city's online reservation system, the honest answer for a long time was Terramar Park, which lists two of them. That changes on Saturday, December 5, when Wedge Preserve Park opens with an opening ceremony at 9:30 a.m., and it adds eight covered courts.

The park covers 36 acres at the northeast corner of Hillsboro Boulevard and Nob Hill Road. In a 2025 construction update, TAPinto Parkland called it "likely to be Parkland's last significant public park." The timing makes that description matter. Wedge opens just as the city has started turning down new park spending. For years to come, this one corner will likely be where most new recreation in Parkland shows up.

Ten Courts Where There Were Two

The city's reservation system, WebTrac, already lists Wedge's courts and fields next to those at the older parks. Here is how the bookable inventory changes:

Facility in the city's system Before Wedge Wedge adds New total
Pickleball courts 2 at Terramar Park 8 10
Basketball courts 4 at Pine Trails Park, 5 at Terramar Park 4 13
Wedge athletic fields 0 FIELD 1, FIELD 2, FIELD A, FIELD B 4

Pickleball sees the biggest change. In the city's system, the number of courts goes from two to ten, and every new one is covered. TAPinto lists the eight courts as covered and the four basketball courts as lighted. Those two details decide when you can actually play: in the middle of the day under a Florida sun, and after dark on the basketball courts.

Plans from construction put the pickleball courts in the middle of the park, closer to Hillsboro Boulevard than to the Miralago community. The maintenance building sits by the Nob Hill entrance. Those placements come from the 2025 site work. On opening day, the signs on site will be the best guide to entrances and parking.

The Rest of the 36 Acres

The courts are one part of a park the city designed to mix organized sports with more open, unscheduled space. TAPinto's October 29 report lists these amenities:

  • For sports: two baseball and softball fields, two multipurpose athletic fields, four lighted basketball courts, eight covered pickleball courts
  • For kids: a large Ninja Warrior-style obstacle course and tower, a beach-themed splash pad, a playground and children's play village
  • For a slower afternoon: walking paths through natural areas, plus a pond with boardwalks and scenic overlooks
  • For gatherings: a community building for classes, gatherings and private events, along with open green space

The pond has a backstory. The 2025 update reported that when crews dug out the lake, they used the fill to build the berm that wraps around the park.

At the 2025 groundbreaking, Mayor Rich Walker said, as TAPinto reported, that "Wedge Preserve Park reflects the values that define Parkland: access to play, open space for gatherings, and that unmistakable small-town charm that makes our city feel like home." Construction began with that ceremony on June 23, 2025. The park opens about 17 months later.

The Pavilions Are Already on the Calendar

You don't have to wait until December 5 to see Wedge in the reservation system. As of November 11, WebTrac lists six Wedge Preserve pavilions, numbered one through six. Each shows a 9:00 a.m. to 1:00 p.m. slot and a 2:00 p.m. to 6:00 p.m. slot, both marked "Call to Reserve." Since those slots go through a phone call, (954) 757-4105 is the number the system lists for questions.

That matters for anyone planning a winter birthday party or a team's end-of-season gathering. Until now, the city's pavilion options were spread across Pine Trails Park, Terramar Park, Liberty Park and the Equestrian Center. Wedge adds six more under one name. The courts and fields appear in the same system, and the city's Wedge Preserve page is where park-specific information is kept.

Why the Splash Pad Arrives at the Right Moment

At its November 3 meeting, the City Commission voted unanimously against a proposed $465,000 design-build contract for a replacement splash pad at Liberty Park. It directed staff to remove the pad there, which no longer works, and to look at lower-cost alternatives, according to a CitizenPortal summary of the meeting. Mayor Walker made the motion and tied it to the statewide vote that took place the same day.

Families who have gotten used to Liberty Park will have a new beach-themed splash pad at Wedge, a short drive north. Liberty Park itself stays in the city's system with its pavilion and playground.

Opening in a Tighter Year

The splash pad vote fits a larger picture. Amendment 3 was on the November 3 statewide ballot as "Increased Homestead Exemption; Lower Cap On Increases In Non-Homestead Property Assessments." In the first set of unofficial returns on Florida Election Watch, it passed with 61.98% of the vote, above the 60% threshold. The Florida Department of State's summary gives the effective date as January 1, 2027.

At the September 14 budget hearing, before the vote, city staff estimated Parkland would collect $4.3 million less revenue in fiscal year 2028 and $8.5 million less in fiscal year 2029 if the amendment passed. After it passed, Mayor Walker opened the November 3 meeting by saying the city had cut its fiscal year 2027 budget by $2 million. He also announced a special strategic planning session for early January, as CitizenPortal reported.

Wedge's own funding moved forward that same night. Ordinance 2026-013, presented for first reading, would move $1.5 million from parks impact fee reserves into a capital fund for the Wedge Preserve project. The mayor described it as a shift of existing money that does not increase the overall budget, according to CitizenPortal. The fiscal year 2027 budget also adds one part-time position for the new park.

Taken together, this means the park was planned, built and staffed before the city started cutting back. A park TAPinto described as likely the city's last major one will also be the most recent major addition Parkland residents get for some time.

December After the Ribbon

Wedge's opening kicks off a December calendar that stays mostly on city time. The Farmers' Market has been running since its November 1 opening day at the Equestrian Center at Temple Park, 8350 Ranch Road. That address has carried much of the city's fall calendar, and in December it has company:

  1. Tuesday, December 1: Registration opens for both Snowfest and the Holiday Home Decorating Contest.
  2. Saturday, December 5: Wedge Preserve Park grand opening, with the ceremony at 9:30 a.m.
  3. Tuesday, December 15: Judging for the Holiday Home Decorating Contest. Online registration closes the same day.
  4. Thursday, December 17: Snowfest, 5:00 to 8:00 p.m., with snow slides, seasonal crafts, music, activities and food trucks. Admission is $20 per child, it is open to Parkland residents only, and registration is required. Decorating contest winners are announced that evening.

Snowfest registration opens just four days before Wedge's ribbon-cutting. Families who plan to do both will want to sign up for Snowfest on December 1 and leave the morning of December 5 open.

If the new park at Hillsboro and Nob Hill has you thinking about how Parkland's north end is changing, I'm always glad to talk about it, whether you've lived here for decades or arrived last spring. Jon Lewis has followed Parkland's parks and neighborhoods for years, and you can find more about the city on the Parkland page. Let's Connect.

Find Your Dream Home

Browse active listings in the area or contact us for off-market listings.

Home Search

What's Your Home Worth?

Have an expert help you find out what your home is really worth.

Home Valuation